Thursday, August 27, 2026

UK National Risk Register 2026 - Urges Citizen Preparedness

 

#19,311


In August of 2008 we looked at the first UK National Risk Register - which ran just 52 pages - and cited pandemic flu as the #1 threat facing the nation.  It's prep advice to the public was fairly limited, essentially urging:

Creating a core stock of essential supplies. This could include bottled water, a battery powered radio, torch, tinned food and alternative heating sources.

Four years later, a slightly larger (58 page) 2012 update was released, which kept pandemic flu at the top of their threat board, but added coastal flooding, terrorist attacks, severe space weather, prolonged power or gas outages, and even volcanic threats to the list.

The last time we looked at the UK Risk Register was in August of 2023, which by that time has expanded to nearly 200 pages. That edition of the NRR detailed 89 risks, within 9 risk themes:

• Terrorism
• Cyber
• State threats
• Geographic and diplomatic
• Accidents and systems failures
• Natural and environmental hazards
• Human, animal and plant health
• Societal
• Conflict and instability

Since then the world has changed radically, with the rise of A.I. and cyber threats, increasing global tensions in Europe and the Middle East, climate change and a record setting El Nino on the horizon, aging infrastructures, and growing economic threats. 

The 2026 edition of the NRR has expanded to a daunting 223 pages - so large that it is accompanied by a 27-page `Guide to the 2026 Risk Register' - which will hopefully provide a more palatable gateway for casual reader. 

 Admittedly, the NRR isn't geared to the general public, as explained below:

This edition of the NRR is available to all but not targeted at the general public. Advice for individuals, households and communities on preparing for a wide range of risks can be found on the Prepare website.

In recent years we've seen a growing willingness of European nations to ask citizens to prepare for emergencies, including 2025's Denk Vooruit: The Netherlands National Citizen Preparedness Drive and last year's EU Commission call for all households to prepare for a wide array of disasters.  

The NRR guide goes on to say:

The risks outlined in the 2026 NRR are significant, but they are not inevitable. Resilience is a national endeavour that relies on a combination of robust government coordination and the proactive responsibility of every individual, business, and community. It is particularly important for owners and operators of CNI to ensure continued delivery of the essential services that underpin UK society and way of life.This “whole-of-society” approach is built on deep partnerships, where we recognise our vital roles in preparing for, responding to, and recovering from emergencies.

The power of collective readiness

When communities take steps to prepare, they act as a force multiplier for national resilience. By managing what they can at home and with those around them, those in a position to do so reduce the immediate demand on frontline services. This ensures that emergency responders and limited resources can be prioritised for those who may need more support or who are in the greatest need. This collective effort is vital to ensure that the national resilience system remains strong enough to protect everyone when it matters most.For further guidance, resources, and advice on bolstering personal and household readiness, visit the Prepare website.

While the full 2026 NRR provides a remarkably detailed UK-centric disaster reference guide, it isn't exactly light reading. Most will find the Guide to the NRR - which still puts a `Disease X' pandemic at the top of their threats list - far more accessible. 

Since it is impossible to summary a 223 page document here, I'll simply provide the links and recommend you download, and peruse, both. 

Documents

National Risk Register 2026

PDF, 22.6 MB, 223 pages

A Guide to the National Risk Register 2026

PDF, 4.75 MB, 27 pages

Next month is National Preparedness Month, and - as we've done every year for nearly 2 decades - AFD will focus a good deal on individual, community, and national preparedness.

Having survived more than a few hurricanes, my personal recommendations include:
  • A battery operated NWS Emergency Radio to find out what was going on, and to get vital instructions from emergency officials
  • A decent first-aid kit, so that you can treat injuries
  • Enough non-perishable food and water on hand to feed and hydrate your family (including pets) for the duration
  • A way to provide light when the grid is down.
  • A way to cook safely without electricity
  • A way to purify or filter water
  • A way to handle basic sanitation and waste disposal.
  • A way to stay cool (fans) or warm when the power is out.
  • A small supply of cash to use in case credit/debit machines are not working
  • An emergency plan, including meeting places, emergency out-of-state contact numbers, a disaster buddy, and in case you must evacuate, a bug-out bag
  • Spare supply of essential prescription medicines that you or your family may need
  • A way to entertain yourself, or your kids, during a prolonged blackout
Being prepared doesn't guarantee you and your loved ones will come through a major disaster unscathed. But it is relatively cheap insurance, and when things do go sideways, it can substantially improve your chances.